| About
FD+CC Federman Design +
Construction Consultants
Since 1948, FD+CC has provided a
comprehensive range of professional pre-construction and
construction administration services on projects worldwide. Our
corporate headquarters, located in New York City, has been
firmly rooted in Manhattan for over 50 years. Our
professional technical expertise services the design and engineering
industry, real estate and construction professions, the hospitality
industry, retail/entertainment, restaurants, sports, healthcare
providers and commercial lenders in the public and private sector.
Since 1991, FD+CC has been certified as a S/W/DBE firm. Included
among our services are:
|
|
|
 |
| COST ESTIMATING PHILOSOPHY AND METHODOLOGY
We cannot underscore enough, how vital
it is to the success of any design and/or construction project, that
cost control be integrated with the design process from the
conceptual phase of the job - when ideas and solutions are first
being formulated - through to the final construction phase
If appropriate, we would approach a
project by providing the design team with a cost model to design to.
This model would take the budget and break down by price each
category and the elements within each category. This model would
also show the percentage of each element and category to the total
budget, so if the design team changes something in one category,
they instantly know how that change impacts the budget and schedule
of the project. The cost model is a fluid document which provides
the design team a road map to design the budget of this project. It
also educates the users and gives them an understanding as to what
to expect with their budget.
Milestone estimates are prepared during
each design phase of the project. We obtain our prices by using the
actual cost method which we pioneered and have utilized for over 50
years. Every project is approached on an individual and
site-specific basis. Along with our data base, material costs are
verified by talking with local vendors, local sub-consultants, local
contractors and CM's. Labor costs are based on actual labor rates.
All of our cost estimates identify cost projections per building for
each building at the time of construction. Any necessary
reconciliation, bid review and negotiation services are offered
throughout the life of the project
We are able to interact in this manner
because we are architects and engineers ourselves so we can truly
add value and input to the design process with the comfort and
security of being cost control experts, aware at all times of where
we are within the budget. We pro-actively and continually apply
value engineering and life cycle analysis through the design
process. We evaluate alternative methods and systems and determine
which would be the most functionally appropriate, design appropriate
and cost effective method.
We are an extremely computer literate
firm. We can scan drawings and quickly track & quantify all
design & quantity changes. This is a breakthrough in areas like
mechanical/electrical where traditionally certain items were very
difficult to track.
This philosophy and unique approach to
cost control has led us to a bid vs. estimate track record of 1% to
3% and would ensure your project's being a successful
one.
|
|
ESTIMATE VS. BID RESULTS |
| PROJECT |
BID |
ESTIMATE |
| Richmond
Federal Courthouse, Richmond, VA |
72,800,000 |
73,300,000 |
| Westchester Courthouse Façade, White Plains,
NY |
16,000,000 |
15,600,000 |
| Orange
County Courthouse, Goshen, NY |
32,600,000 |
32,400,000 |
| Savannah Courthouse & Annex, Savannah,
GA |
37,000,000 |
36,400,000 |
| Beckley Courthouse, Beckley, West Virginia |
27,400,000 |
26,900,000 |
| Scranton Courthouse Renovation & New Annex,
PA |
10,000,000 |
10,200,000 |
| New
Annex, Scranton, PA New Federal Office Building Annex
& Post Office, Scranton , Pa. |
34,500,000 |
35,000,000 |
| Carnegie Lobby Renovation, NY, NY |
2,011,000 |
2,014,000 |
| Queensway Bay Harbor Development, Long Beach,
CA |
33,200,000 |
33,100,000 |
| Yonkers Waterfront, Yonkers, NY |
14,500,000 |
14,700,000 |
| Riker's Island AMKC Kitchen and AMKC Pantries,
NY |
35,041,000 |
34,203,000 |
| Cadet
Mess Hall, U. S. Military Academy, West Point |
28,100,000 |
28,000,000 |
| New
York Hospital - Foundations, NY, NY |
13,100,000 |
12,900,000 |
| Rockefeller University, NY, NY |
60,120,000 |
59,500,000 |
| Schering Plough, Kenilworth, NJ |
210,000,000 |
205,000,000 |
| N Y C
TA Atlantic Avenue 3 Station Hub, Brooklyn, NY |
105,600,000 |
105,000,000 |
| NYC TA
207th Street Station, NY |
13,400,000 |
13,000,000 |
| NYCTA
Myrtle Avenue Station, NY |
8,200,000 |
8,144,000 |
| NYC TA
Church Street Station, NY |
7,240,000 |
7,200,000 |
| NYC TA
Flatbush Avenue Subway Station, NY |
8,550,000 |
8,500,000 |
| NYC TA
Utica Avenue Subway Station, NY |
9,100,000 |
9,150,000 |
| South
Eastern Pennsylvania Transportation Authority, PA, Girard
Avenue |
33,500,000 |
35,000,000 |
| North
Entry Access, Grand Central Terminal |
54,000,000 |
53,900,000 |
| Grand
Central Terminal North Entry Access |
56,000,000 |
55,500,000 |
| NYC
SCA Walton High School, NY |
24,000,000 |
23,050,000 |
| NYC
SCA Washington Avenue School, NY |
24,000,000 |
23, 060,000 |
| NYC
SCA P.S.146 (Brooklyn) |
10,764,358 |
10,474,934 |
| NYC
SCA Eastern District Highschool |
4,500,000 |
4,600,000 |
| Metro
Tech, Brooklyn, NY |
59,389,000 |
58,000,000 |
| Morgan
Bank, Sixty Wall Street, NY, NY |
100,000,000 |
96,000,000 |
| New
York City Juvenile Detention Facilities, Brooklyn and
Bronx |
52,000,000 |
50,000,000 |
| Saratoga Performing Arts Center - Saratoga,
NY |
535,000 |
525,000 |
| NYCHA
Eastchester Gardens Community Center |
2,934,000 |
2,838,500 | |
| CONSTRUCTION
ADMINISTRATION
All FD+CC staff members are experienced
with and thoroughly familiar with construction methods and practices
including phasing and scheduling. In addition, all have a background
which includes project design.
With these skills in hand, FD+CC is
able to provide comprehensive constructability reviews of projects.
Our analysis is able to pinpoint potential problems
including:
- Availability of materials
- Conflicts in documents
- Difficult details
- Errors
- Long-lead items
- Omissions
- Phasing
- Scheduling
- Staging
The result of our constructability
review is that these potential problem items are resolved
pre-construction, before they become actual problems during
construction.
VALUE ENGINEERING
Value engineering is an integral part
of FD+CC's services. All major items on projects are subjected to a
functional analysis. Following this preliminary step, various
alternate systems are defined and then priced. The result is that
the system chosen is the most design and functionally appropriate
and the most cost effective solution.
FD+CC is also able to participate
in and conduct formal 40-hour value engineering workshops in
accordance with the format as defined by the Society of American
Value Engineers.
SCHEDULING
FD+CC maintains a staff of experienced
schedulers skilled in applying the techniques of network scheduling
to construction applications of all kinds. FD+CC has been called
upon to review and comment on construction schedules for logic and
comprehensiveness. Our schedulers are supported by cost estimators,
quantity surveyors, and construction managers with experience in a
variety of construction applications for the public and private
sectors including infrastructure projects, schools, hospitals,
office buildings, and laboratories
The employees at FD+CC customarily use
scheduling systems as created by Primavera Systems, Inc. for
analysis and display of schedules. We are, however, versed in the
application of several other systems, such as Microsoft Project
Planner, and can readily adapt our procedures to specific client
requirements.
SPECIFICATION WRITING
The writing of specifications is a task
that FD+CC is expert in. By coupling our computer capabilities with
our knowledge of design and construction materials and methods, we
are able to accomplish technical specification writing in a
thorough, time efficient manner.
All of our specification work is done
in accordance with the standards of the Construction Specifications
Institute. We are familiar with many formats including: CSI Format
AIA Master Spec U. S. Army Corps of Engineers, General Services
Administration, NAVFAC.
Our typical specification tasks include
the compilation of outline specifications at the earlier stages of a
project and final specifications at the close of contract
documents.
CADD
CAPABILITY
FD+CC has a unique computer system that
enables us to interact with the architect/engineer's CADD
system. FD+CC is able to scan the architect/engineer's
drawings and quickly track design and quantity changes. This sets us
apart from our competitors and results in significant time and cost
savings to our clients. The FD+CC approach is cohesive, thorough,
and cutting edge which insures a project coming within budget and on
time. Our computer prowess and capability has enabled us to achieve
bid vs. estimate results within 1 - 3%.
WBE/DBE/SBE CERTIFICATION
- NYC DEPARTMENT OF BUSINESS
SERVICES
- NYC/MTA METROPOLITAN TRANSPORTATION
AUTHORITY
- NYS EMPIRE STATE DEVELOPMENT
- NYS/NJ PORT AUTHORITY OF NEW YORK,
NEW JERSEY
- SEPTA SOUTHEASTERN PENNSYLVANIA
TRANSPORTATION AUTHORITY
- BOSTON, CITY OF BOSTON
- NJT NEW JERSEY TRANSIT
- NFTA NIAGARA FRONTIER TRANSPORTATION
AUTHORITY, BUFFALO, NY
- NJT NEW JERSEY COMMERCE &
ECONOMIC GROWTH COMMISSION
- NYC NEW YORK SCHOOL CONSTRUCTION
AUTHORITY
|
|
FD+CC INC. (FEDERMAN
DESIGN + CONSTRUCTION CONSULTANTS INC.) 560 BROADWAY, SUITE
508 NEW YORK, NY 10012 TELEPHONE . 212-343-0838 Ext 18
917-670-7152 FAX NO. 212-343-3133
PTOCCI@FDCCINC.COM
CERTIFIED
S/D/WBE
|
|